PREDICTION OF PROJECT ACTUAL RESULTS AT PRE-PROJECT PLANNING STAGE

Authors

  • V. M. Liovkin
  • V. I. Dubrovin
  • V. F. Onishchenko

DOI:

https://doi.org/10.15588/1607-3274-2011-1-9

Keywords:

project management, pre-project planning process, project results prediction, Project Definition Rating Index, project failure risk.

Abstract

The problem of predicting project actual results deviation from the results expected at the pre-project planning stage is considered. The efficiency of neural network-based models is analyzed. It is proposed to use the neural-evolution approach for problem solving and to use PDRI and project failure risk values as informative criterions. The criterion of results informativity is proposed. The method of predicting actual project results deviation from the results expected at the pre-project planning stage is presented.

Published

2011-08-12

How to Cite

Liovkin, V. M., Dubrovin, V. I., & Onishchenko, V. F. (2011). PREDICTION OF PROJECT ACTUAL RESULTS AT PRE-PROJECT PLANNING STAGE. Radio Electronics, Computer Science, Control, (1). https://doi.org/10.15588/1607-3274-2011-1-9

Issue

Section

Mathematical and computer modelling