[1]
Romanuke, V.V. 2012. OPTIMAL STRATEGIES CONTINUUM FOR PROJECTING THE FOURMOUNT CONSTRUCTION UNDER INTERVAL UNCERTAINTIES WITH INCORRECTLY PRE-EVALUATED TWO LEFT AND ONE RIGHT ENDPOINTS. Radio Electronics, Computer Science, Control. 1 (Jul. 2012). DOI:https://doi.org/10.15588/1607-3274-2012-1-18.