Romanuke, V. V. (2012). OPTIMAL STRATEGIES CONTINUUM FOR PROJECTING THE FOURMOUNT CONSTRUCTION UNDER INTERVAL UNCERTAINTIES WITH INCORRECTLY PRE-EVALUATED TWO LEFT AND ONE RIGHT ENDPOINTS. Radio Electronics, Computer Science, Control, (1). https://doi.org/10.15588/1607-3274-2012-1-18