Romanuke, V. V. (2012) “OPTIMAL STRATEGIES CONTINUUM FOR PROJECTING THE FOURMOUNT CONSTRUCTION UNDER INTERVAL UNCERTAINTIES WITH INCORRECTLY PRE-EVALUATED TWO LEFT AND ONE RIGHT ENDPOINTS”, Radio Electronics, Computer Science, Control, (1). doi: 10.15588/1607-3274-2012-1-18.